REFERENCE LIST OF POWER PLANT HEAVY EQUIPMENT HANDLING EXPERIENCE
Beside the oil & gas sector SHAMOLIMA’s experience and knowledge in moving power plant equipment is the most extensive in Bangladesh. Following are some details of our power plant move experience:
Summit Power Project | |
1 | Transportation of Wartsila Generator Engine (4 Nos. – weighing 81-83 Ton each) from Mongla port to Summit Power’s 33MW Project site at Ashulia, Savar in March/April 2007. |
2 | Transportation of Wartsila Generator Alternator (4 Nos. – weighing 30 Ton each) from Mongla port to Summit Power’s 33MW Project site at Ashulia, Savar in March/April 2007. |
3 | Transportation of Wartsila Generator Engine Chassis (4 Nos. – weighing 20 Ton each) from Mongla port to Summit Power’s 33MW Project site at Ashulia, Savar in March/April 2007. |
4 | Transportation of Wartsila Generator Engine (2 Nos. – weighing 67-69 Ton each) from Chittagong port to Summit Power’s 13.9MW Project site at Chandina Comilla in April/May 2006. |
5 | Transportation of Wartsila Generator Alternator (2 Nos. – weighing 29 Ton each) from Chittagong port to Summit Power’s 13.9MW Project site at Chandina Comilla in April/May 2006. |
6 | Transportation of Wartsila Generator Engine Chassis (2 Nos. – weighing 16 Ton each) from Chittagong port to Summit Power’s 13.9MW Project site at Chandina Comilla in April/May 2006. |
7 | Transportation of Wartsila Generator Engine Chassis (8 Nos. – weighing 20 Ton each) from Chittagong port to Summit Power’s 22MW Project site at Ullapara, Sirajgonj in July/August 2008. |
8 | Also moved auxiliary equipment loaded in 40’ containers (20 Nos.) from Chittagong port to Summit Power’s Project site at Ullapara, Sirajgonj in July/August 2008. |
9 | Transportation of Wartsila Generator Engine Chassis (4 Nos. – weighing 81-83 Ton each) from Mongla port to Summit Power’s 33MW Project site at Maona Gazipur in Sept./October 2008. |
10 | Transportation of Wartsila Generator Alternator (4 Nos. – weighing 30 Ton each) from Mongla port to Summit Power’s 33MW Project site at Maona Gazipur in September/October 2008. |
11 | Transportation of Wartsila Generator Engine Chassis (4 Nos. – weighing 20 Ton each) from Mongla port to Summit Power’s 33MW Project site at Maona Gazipur in September/October 2008. |
12 | Transportation of Wartsila Generator Engine Chassis (4 Nos. – weighing 81-83 Ton each) from Chittagong port to Summit Power’s 33MW Project site at Jangalia Comilla in December 2008/January 2009. |
13 | Transportation of Wartsila Generator Alternator (4 Nos. – weighing 30 Ton each) from Chittagong port to Summit Power’s 33MW Project site at Jangalia Comilla in January 2009. |
14 | Transportation of Wartsila Generator Engine Chassis (4 Nos. – weighing 20 Ton each) from Chittagong port to Summit Power’s 33MW Project site at Jangalia Comilla in January 2009. |
15 | We have provided 60Ton Crane at their Madanganj on going power plant to move their heavy equipment. |
Dooreen Power Project | |
1 | Transportation of GE Generating Sets (8 Nos. – weighing 20 Ton each) with containerized auxiliary equipment from Chittagong port of Dooreen Power’s 22MW Power Plant site at Tangail in July 2008. |
2 | Transportation of GE Generating Sets (8 Nos. – weighing 20 Ton each) with containerized auxiliary equipment from Chittagong port of Dooreen Power’s 22MW Power Plant site at Narshingdi in September 2008. |
GBB’s Power Plant | |
1 | Transportation of transformer (1 No. – Weighing 60 Ton) from Chittagong port of GBB’s Power Plant including placement of its foundation at Bogra in December 2009 |
ISOLUX | |
1 | We have provided our 35 Ton Crane, 70 Ton Crane, Low bed trailer, rigger to load their power plant heavy equipment and also we have provided 500 KVA Generator to power their Erection components at ISOLUX 335 MW Siddhirganj PP project Site and Isolux Bibiyana 450 MW site. |
2 | Shifting of their 1 no. of 38 Ton Transformer at Shiddhirganj site |
L&T | |
1 | 60 Ton Crane, 45 Ton Crane, 35 Ton Crane, 25 Ton Crane, 40ft High Bed Trailer provided for their Bibiyana Power Plant site. |
Samsung Power Plant 335 MW Siddhirganj. | |
1 | 70 Ton Crane, 45 Ton Crane, 40ft High Bed Trailer already provided for Monthly basis. |
Rampura Sub-Station Project | |
1 | Customs clearing & Transportation of Entire sub-station materials including Heavy Transformer (7 Nos. – weighing 50 Ton each) from Chittagong port to project site at Rampura under PGCB in 2001/2002. |
Chittagong Cement Clinker Grinding Co. Ltd. (CCCGCL) Project | |
1 | Transportation of Wartsila generator unit (1 No. – Weighing 101 Ton) complete with alternator and chassis plus all associated project materials (total 227 Ton) from Chittagong port to Chittagong Cement Clinker Grinding Co. Ltd. (CCCGCL) Project site at Patenga Chittagong in Sept. 2002 |
Overhauling work of Ashugonj Unit #3 | |
1 | We were the agent of Mitsui & Co. Ltd., Japan and were closely associated for the overhauling work of Ashugonj Unit #3 including C&F, Transportation of imported equipment in bulk and containers, Supply of Labors, Equipment rental with catering service of foreign experts in 2002/2003. |
BanglaTrac Jhuldha Power Plant | |
1 | Transportation Gen Sets having 220 Ton each. Total Gen set 8 nos. Transportation from Chittagong port to Jhulda BanglaTrac power plant by using barge. |
BanglaTrac Baghabari Power Plant | |
1 | Transportation 60 nos. of Gen Sets each having 17 Ton from Chittagong to Baghabari by high bed trailer. |
Bangla Trac Daudkandi Power Plant | |
1 | Transportation of 4nos. of Gen Set having weight 80 Ton each and Transformer around 200nos. having weigh 33 Ton each by using barge and trailer. |
EPV Thakurgaon 115 MW Power Plant Project by Energypac | |
1 | Transportation of 177 Ton MAN Engine X 6 nos. from Mongla port to Thakurgaon and placing on to foundation |
2 | Transportation of 41 Ton Base Frame X 6 nos. from Mongla port to Thakurgaon |
3 | Transportation of 30 Ton Turbo Charger X 12 nos. from Mongla port to Thakurgaon |
4 | Transportation of 4 Ton Flywheel X 6 nos. from Mongla port to Thakurgaon |
5 | Transportation of 40 nos. of Container Mongla port to Thakurgaon |
6 | Pre-assemble of Engine by using Gantry Crane. |
7 | Transportation of 68 Ton Alternator X 6 nos. from Mongla port to Thakurgaon |
8 | Placing 6nos X 68 Ton Alternator by using Crawler Crane and automatic hydraulic & Jacking system |
9 | On Going: Providing 16 Axles SPMT to Deugro to transport project cargo/material of MEGHNAGHAT 718MW CCPP PROJECT.Also providing 50Ton Crane, 35T Crane, Telescopic Forklift and different types of equipment directly at Samsung Project site. |